HTTP 200 OK
Allow: GET, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"count": 1415,
"next": "https://api.spaceflightnewsapi.net/v4/reports/?format=api&limit=10&offset=20",
"previous": "https://api.spaceflightnewsapi.net/v4/reports/?format=api&limit=10",
"results": [
{
"id": 1651,
"title": "ISS Daily Summary Report – 7/22/2024",
"authors": [],
"url": "https://blogs.nasa.gov/stationreport/2024/07/22/iss-daily-summary-report-7-22-2024/",
"image_url": "https://upload.wikimedia.org/wikipedia/commons/8/8a/ISS_after_completion_%28as_of_June_2006%29.jpg",
"news_site": "NASA",
"summary": "Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew by performing stowage clearing operations to prepare for the ArgUS installation operations. They also uploaded new software into the Microgravity Science Glovebox (MSG) Laptop Computer (MLC). Payloads: JEM Internal Ball Camera 2: The JEM Internal Ball Camera Robot 2 was setup …",
"published_at": "2024-07-22T15:47:00Z",
"updated_at": "2024-07-24T15:47:37.223277Z"
},
{
"id": 1649,
"title": "Starliner thruster ground testing complete, data reviews underway",
"authors": [],
"url": "https://starlinerupdates.com/starliner-thruster-ground-testing-complete-data-reviews-underway/",
"image_url": "https://boeing-jtti.s3.amazonaws.com/wp-content/uploads/2023/02/13165520/docking_with_earth_in_background_out_window.png",
"news_site": "Boeing",
"summary": "Ground testing of a Starliner Reaction Control System (RCS) thruster at White Sands Test Facility in New Mexico is complete, and teams are now turning their attention to data reviews. The test objective was to observe thruster degradation so teams could get a better understanding of why some thrusters were deselected in-flight and what, if […]",
"published_at": "2024-07-18T17:14:30Z",
"updated_at": "2024-07-18T17:17:52.237494Z"
},
{
"id": 1652,
"title": "ISS Daily Summary Report – 7/18/2024",
"authors": [],
"url": "https://blogs.nasa.gov/stationreport/2024/07/18/iss-daily-summary-report-7-18-2024/",
"image_url": "https://upload.wikimedia.org/wikipedia/commons/8/8a/ISS_after_completion_%28as_of_June_2006%29.jpg",
"news_site": "NASA",
"summary": "Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew with a few payload activities and completed Onboard Training for Backup Flight Control Proficiency. Payloads: Electro-static Levitation Furnace (ELF): The ELF cartridge holder containing the latest melted sample was removed and replaced with a new sample holder and sample. The completed …",
"published_at": "2024-07-18T15:47:00Z",
"updated_at": "2024-07-24T15:47:37.240326Z"
},
{
"id": 1650,
"title": "ISS Daily Summary Report – 7/17/2024",
"authors": [],
"url": "https://blogs.nasa.gov/stationreport/2024/07/17/iss-daily-summary-report-7-17-2024/",
"image_url": "https://upload.wikimedia.org/wikipedia/commons/8/8a/ISS_after_completion_%28as_of_June_2006%29.jpg",
"news_site": "NASA",
"summary": "Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew by completing the ongoing Plant Water Management 6 (PWM-6) activities. Payloads: Plant Ultraviolet-B (Plant UV-B): A laptop was connected and setup in preparation for future Plant UV-B operations. More information on this experiment can be found here. Plant Water Management 6 …",
"published_at": "2024-07-17T15:37:00Z",
"updated_at": "2024-07-24T15:37:44.169092Z"
},
{
"id": 1648,
"title": "ISS Daily Summary Report – 7/16/2024",
"authors": [],
"url": "https://blogs.nasa.gov/stationreport/2024/07/16/iss-daily-summary-report-7-16-2024/",
"image_url": "https://upload.wikimedia.org/wikipedia/commons/8/8a/ISS_after_completion_%28as_of_June_2006%29.jpg",
"news_site": "NASA",
"summary": "Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew by completing a Waste Hygiene Compartment (WHC) Filter Removal & Replacement (R&R), and completing various hydroponic flow tests with Plant Water Management 6 (PWM-6) hardware. Payloads: Lumina: The crew power-cycled the Lumina hardware, and transferred the science data to a Station …",
"published_at": "2024-07-16T20:47:00Z",
"updated_at": "2024-07-17T20:47:40.698401Z"
},
{
"id": 1647,
"title": "ISS Daily Summary Report – 7/15/2024",
"authors": [],
"url": "https://blogs.nasa.gov/stationreport/2024/07/15/iss-daily-summary-report-7-15-2024/",
"image_url": "https://upload.wikimedia.org/wikipedia/commons/8/8a/ISS_after_completion_%28as_of_June_2006%29.jpg",
"news_site": "NASA",
"summary": "Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew assisted the ISS crew by performing a USOS food audit and continuing to complete different payload activities. Payloads: Combustion Integrated Rack (CIR): Fuel Oxidizer Management Assembly (FOMA) Calibration was performed. The upper rack doors were opened, the bottle valves were closed, the pressure in the …",
"published_at": "2024-07-15T18:07:00Z",
"updated_at": "2024-07-16T18:07:34.887615Z"
},
{
"id": 1646,
"title": "ISS Daily Summary Report – 7/12/2024",
"authors": [],
"url": "https://blogs.nasa.gov/stationreport/2024/07/12/iss-daily-summary-report-7-12-2024/",
"image_url": "https://upload.wikimedia.org/wikipedia/commons/8/8a/ISS_after_completion_%28as_of_June_2006%29.jpg",
"news_site": "NASA",
"summary": "Northrup Grumman 20 (NG-20) Cygnus Departure: Today, Cygnus unberthed from the Node 1 Nadir Common Berthing Mechanism (CBM) using the Space Station Remote Manipulator System (SSRMS), then maneuvered to the release position and released for departure at 6:03 AM CST. Cygnus, filled with waste/trash from the space station packed by the crew, will perform a …",
"published_at": "2024-07-12T17:47:00Z",
"updated_at": "2024-07-16T17:47:37.565885Z"
},
{
"id": 1642,
"title": "ISS Daily Summary Report – 7/11/2024",
"authors": [],
"url": "https://blogs.nasa.gov/stationreport/2024/07/11/iss-daily-summary-report-7-11-2024/",
"image_url": "https://upload.wikimedia.org/wikipedia/commons/8/8a/ISS_after_completion_%28as_of_June_2006%29.jpg",
"news_site": "NASA",
"summary": "Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew performed Extravehicular (EVA) maintenance activities and assisted the ISS crew in various payload operations. Payloads: Genes in Space Molecular Operations and Sequencing (GiSMOS): Wastewater was collected and DNA extraction was performed on the sample. More information on this experiment can be found here. ISS Ham Radio: …",
"published_at": "2024-07-11T18:27:00Z",
"updated_at": "2024-07-12T18:27:35.576594Z"
},
{
"id": 1641,
"title": "CFT Commander Rates Starliner Handling of Manual Flying Tests",
"authors": [],
"url": "https://starlinerupdates.com/cft_commander_rates_starliner_handling_of_manual_flying_tests/",
"image_url": "https://boeing-jtti.s3.amazonaws.com/wp-content/uploads/2023/02/13165520/docking_with_earth_in_background_out_window.png",
"news_site": "Boeing",
"summary": "On the Starliner crew’s 35th day in space, Crew Flight Test Commander Butch Wilmore brought the focus back to day one. “Launch was spectacular! I mean, truly amazing,” Wilmore said. During the first press conference between Wilmore, pilot Suni Williams, and the media, he praised Starliner for its precision. “The spacecraft performed unbelievably well,” Wilmore […]",
"published_at": "2024-07-10T22:41:21Z",
"updated_at": "2024-07-10T22:47:51.580679Z"
},
{
"id": 1643,
"title": "ISS Daily Summary Report – 7/10/2024",
"authors": [],
"url": "https://blogs.nasa.gov/stationreport/2024/07/10/iss-daily-summary-report-7-10-2024/",
"image_url": "https://upload.wikimedia.org/wikipedia/commons/8/8a/ISS_after_completion_%28as_of_June_2006%29.jpg",
"news_site": "NASA",
"summary": "Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew completed the ongoing Fluid System Servicer (FSS) refills, and purged and stowed the FSS and associated jumpers, and then participated in the on-orbit emergency simulation. The CFT crew also held a PAO event to answer questions from the media. Payloads: Cerebral Autoregulation: Cerebral Autoregulation measurement …",
"published_at": "2024-07-10T18:27:00Z",
"updated_at": "2024-07-12T18:27:35.597873Z"
}
]
}